[{"data":1,"prerenderedAt":98},["ShallowReactive",2],{"work-details-1":3},{"work":4,"imagePath":39,"latestWorkList":40},{"id":5,"createdAt":6,"type":7,"title":8,"description":9,"point":10,"contents":11,"person":22,"images":26},1,"2019/6/20","施工業務サポート","ドローン3次元起工測量","従来施工の発注でしたが、作業効率の向上を図るため積極的にICTを活用しました。ボックスカルバート工の床掘ですので、施工時のGNSS衛星の受信状況を考慮し、工事現場付近にRTK固定局を設置しました。また、起工測量時に、ICT建機のローカライゼーション作業を兼ねてGNSS計測を実施しました。","UAV（ドローン）を用いた三次元測量を実施。上空が開けている現場だったため、標定点・検証点の測定にはGNSS測量器を活用。",{"classification":12,"summary":13,"order":14,"process":15,"scale":16,"area":17,"period":18,"machine":19,"system":20,"comment":21},"河川土工","工事用道路の設置","ICT施工者希望I型","3次元起工測量","函渠床掘 約10,000㎥","島根県","令和元年6月～令和2年1月","DJI Phantom4Pro V2.0","DJI GSPro","従来施工の発注でしたが、作業効率の向上を図るため積極的にICTを活用しました。\nボックスカルバート工の床掘ですので、施工時のGNSS衛星の受信状況を考慮し、工事現場付近にRTK固定局を設置しました。\nまた、起工測量時に、ICT建機のローカライゼーション作業を兼ねてGNSS計測を実施しました。",{"name":23,"img":24,"twitter":25},"川口 太助","img_staff-avatar-3","https://x.com/icon_kawaguchi",[27,31,35],{"img":28,"alt":29,"desc":30},"img_works-1-1","ICT施工起工測量_RTK-GNSS固定局設置と工事基準点座標計測","RTK-GNSS固定局設置と工事基準点座標計測",{"img":32,"alt":33,"desc":34},"img_works-1-2","ICT施工起工測量_空撮前の風速チェックとUAV空撮","風速チェックとUAV空撮",{"img":36,"alt":37,"desc":38},"img_works-1-3","ICT施工起工測量_UAV飛行のための対空標識座標計測（標定点/検証点）","対空標識座標計測（標定点／検証点）","https://img.kensetsu-ict.com/work/img_works-1-1.jpg",[41,60,77,87],{"id":42,"title":43,"category":44,"status":45,"classificationList":46,"order":48,"summary":49,"images":50,"imageList":50,"person":56},"279","構造物工（橋台躯体工）におけるICT活用工事・BIM/CIM活用工事","施工","public",[47],"道路土工","ICT施工者希望Ⅱ型","ICT構造物（橋台）工",[51],["Reactive",52],{"id":53,"img":54,"alt":55},"1","img_works-279-1","BIM／CIM3次元モデル1",{"name":57,"img":58,"twitter":59},"宮川 栄幸","img_staff-avatar-1","",{"id":61,"title":62,"category":63,"status":45,"classificationList":64,"order":69,"summary":70,"images":71,"imageList":71,"person":76},"278","ICT活用工事（土工）導入講習 中級編（2026年）","セミナー・研修",[65,66,67,68],"DX・i-Con全般","3次元データ作成","3次元測量","BIM/CIM","民間企業","オンライン",[72],["Reactive",73],{"id":53,"img":74,"alt":75},"img_works-278-1","資料サムネイル",{"name":57,"img":58,"twitter":59},{"id":78,"title":79,"category":63,"status":45,"classificationList":80,"order":69,"summary":70,"images":81,"imageList":81,"person":85},"277","ICT活用工事（土工）導入講習 初級編（2026年）",[65],[82],["Reactive",83],{"id":53,"img":84,"alt":75},"img_works-277-1",{"name":23,"img":24,"twitter":86},"https://twitter.com/icon_kawaguchi",{"id":88,"title":89,"category":44,"status":45,"classificationList":90,"order":48,"summary":91,"images":92,"imageList":92,"person":97},"276","造成工事（除雪基地）におけるICT土工・ICT法面工",[47],"ICT土工",[93],["Reactive",94],{"id":53,"img":95,"alt":96},"img_works-276-1","TLS出来形測量（ICT法面工）",{"name":23,"img":24,"twitter":86},1776764158688]