[{"data":1,"prerenderedAt":102},["ShallowReactive",2],{"work-details-122":3},{"work":4,"imagePath":43,"latestWorkList":44},{"id":5,"createdAt":6,"type":7,"title":8,"description":9,"point":10,"contents":11,"person":20,"images":24},122,"2021/10/29","施工業務サポート","ICT建機精度確認試験","建機メーカー担当者のご協力のもと、ICT建機のキャリブレーションと精度確認試験を実施しました。時間帯によってはGNSS受信状況に変動が見られましたが、施工作業において必要な精度確保は確認することができました。","ICT建機キャリブレーションとICT建機精度確認試験を実施。",{"order":12,"classification":13,"summary":14,"process":8,"scale":15,"area":16,"period":17,"machine":18,"system":19,"comment":9},"ICT施工者希望B型","河川土工","ICT掘削工\nICT作業土工","掘削工　　約280㎥\n作業土工　約350㎥","島根県","令和3年10月～令和4年7月","日本キャタピラー 320（バックホウ）","Nikon Trimble Business Center\nNikon Trimble EarthWorks",{"name":21,"img":22,"twitter":23},"川口 太助","img_staff-avatar-3","https://x.com/icon_kawaguchi",[25,28,31,34,37,40],{"img":26,"alt":27,"desc":27},"img_works-122-1","ICTバックホウ",{"img":29,"alt":30,"desc":30},"img_works-122-2","ICT建機のキャリブレーション1",{"img":32,"alt":33,"desc":33},"img_works-122-3","ICT建機のキャリブレーション2",{"img":35,"alt":36,"desc":36},"img_works-122-4","ICT建機のキャリブレーション3",{"img":38,"alt":39,"desc":39},"img_works-122-5","ICT建機精度確認試験1",{"img":41,"alt":42,"desc":8},"img_works-122-6","ICT建機精度確認試験2","https://img.kensetsu-ict.com/work/img_works-122-1.jpg",[45,64,81,91],{"id":46,"title":47,"category":48,"status":49,"classificationList":50,"order":52,"summary":53,"images":54,"imageList":54,"person":60},"279","構造物工（橋台躯体工）におけるICT活用工事・BIM/CIM活用工事","施工","public",[51],"道路土工","ICT施工者希望Ⅱ型","ICT構造物（橋台）工",[55],["Reactive",56],{"id":57,"img":58,"alt":59},"1","img_works-279-1","BIM／CIM3次元モデル1",{"name":61,"img":62,"twitter":63},"宮川 栄幸","img_staff-avatar-1","",{"id":65,"title":66,"category":67,"status":49,"classificationList":68,"order":73,"summary":74,"images":75,"imageList":75,"person":80},"278","ICT活用工事（土工）導入講習 中級編（2026年）","セミナー・研修",[69,70,71,72],"DX・i-Con全般","3次元データ作成","3次元測量","BIM/CIM","民間企業","オンライン",[76],["Reactive",77],{"id":57,"img":78,"alt":79},"img_works-278-1","資料サムネイル",{"name":61,"img":62,"twitter":63},{"id":82,"title":83,"category":67,"status":49,"classificationList":84,"order":73,"summary":74,"images":85,"imageList":85,"person":89},"277","ICT活用工事（土工）導入講習 初級編（2026年）",[69],[86],["Reactive",87],{"id":57,"img":88,"alt":79},"img_works-277-1",{"name":21,"img":22,"twitter":90},"https://twitter.com/icon_kawaguchi",{"id":92,"title":93,"category":48,"status":49,"classificationList":94,"order":52,"summary":95,"images":96,"imageList":96,"person":101},"276","造成工事（除雪基地）におけるICT土工・ICT法面工",[51],"ICT土工",[97],["Reactive",98],{"id":57,"img":99,"alt":100},"img_works-276-1","TLS出来形測量（ICT法面工）",{"name":21,"img":22,"twitter":90},1775866473408]