[{"data":1,"prerenderedAt":95},["ShallowReactive",2],{"work-details-14":3},{"work":4,"imagePath":37,"latestWorkList":38},{"id":5,"createdAt":6,"type":7,"title":8,"description":9,"point":10,"contents":11,"person":20,"images":24},14,"2019/12/25","施工業務サポート","ローカライゼーション","対岸の国道沿いでの工事基準点の計測作業では、まず安全第一に効率的に作業を行いました。GNSS受信状況を見ながら適切な工事基準点を選別し、合計7点でローカライゼーションを完了しました。","4万㎡を超える広域な施工範囲を、対岸に設置されたものも含めた5点以上の工事基準点を使ってローカライゼーションを実施。",{"classification":12,"summary":13,"order":14,"process":8,"scale":15,"area":16,"period":17,"machine":18,"system":19,"comment":9},"総合マネジメント","ICT掘削工","ICT施工者希望Ⅱ型","約40,000㎡","島根県","令和元年9月〜令和2年3月","Nikon Trimble SPS986","ネットワーク型RTK-GNSS",{"name":21,"img":22,"twitter":23},"川口 太助","img_staff-avatar-3","https://x.com/icon_kawaguchi",[25,29,33],{"img":26,"alt":27,"desc":28},"img_works-14-1","河川添削工事のICT施工＿施工対象範囲","施工対象範囲",{"img":30,"alt":31,"desc":32},"img_works-14-2","ICT施工ローカライゼーションの様子1","計測作業1",{"img":34,"alt":35,"desc":36},"img_works-14-3","ICT施工ローカライゼーションの様子2","計測作業2","https://img.kensetsu-ict.com/work/img_works-14-1.jpg",[39,57,74,84],{"id":40,"title":41,"category":42,"status":43,"classificationList":44,"order":14,"summary":46,"images":47,"imageList":47,"person":53},"279","構造物工（橋台躯体工）におけるICT活用工事・BIM/CIM活用工事","施工","public",[45],"道路土工","ICT構造物（橋台）工",[48],["Reactive",49],{"id":50,"img":51,"alt":52},"1","img_works-279-1","BIM／CIM3次元モデル1",{"name":54,"img":55,"twitter":56},"宮川 栄幸","img_staff-avatar-1","",{"id":58,"title":59,"category":60,"status":43,"classificationList":61,"order":66,"summary":67,"images":68,"imageList":68,"person":73},"278","ICT活用工事（土工）導入講習 中級編（2026年）","セミナー・研修",[62,63,64,65],"DX・i-Con全般","3次元データ作成","3次元測量","BIM/CIM","民間企業","オンライン",[69],["Reactive",70],{"id":50,"img":71,"alt":72},"img_works-278-1","資料サムネイル",{"name":54,"img":55,"twitter":56},{"id":75,"title":76,"category":60,"status":43,"classificationList":77,"order":66,"summary":67,"images":78,"imageList":78,"person":82},"277","ICT活用工事（土工）導入講習 初級編（2026年）",[62],[79],["Reactive",80],{"id":50,"img":81,"alt":72},"img_works-277-1",{"name":21,"img":22,"twitter":83},"https://twitter.com/icon_kawaguchi",{"id":85,"title":86,"category":42,"status":43,"classificationList":87,"order":14,"summary":88,"images":89,"imageList":89,"person":94},"276","造成工事（除雪基地）におけるICT土工・ICT法面工",[45],"ICT土工",[90],["Reactive",91],{"id":50,"img":92,"alt":93},"img_works-276-1","TLS出来形測量（ICT法面工）",{"name":21,"img":22,"twitter":83},1776764162229]