[{"data":1,"prerenderedAt":96},["ShallowReactive",2],{"work-details-18":3},{"work":4,"imagePath":38,"latestWorkList":39},{"id":5,"createdAt":6,"type":7,"title":8,"description":9,"point":10,"contents":11,"person":21,"images":25},18,"2020/1/27","施工業務サポート","ICT建機データ設計","この現場で使用するICTバックホウの精度確認に立会い、施工開始に支障が無いことを確認の上、データ設定作業を実施しました。掘削土の運搬作業やその他付随作業が並行して行われることから、その後設定された3次元施工データを活用することで、メインの掘削作業以外でもICTバックホウを丁張代わりに、その他の建機作業と連携しながら効率的に作業を進めることができています。","河川掘削工事で使用するICT建機の精度確認実施後、施工用データを設定",{"order":12,"classification":13,"summary":14,"process":15,"scale":16,"area":17,"period":18,"machine":19,"system":20,"comment":9},"ICT施工者希望Ⅱ型","総合マネジメント","ICT掘削工","ICT建機データ設定","約40,000㎡","島根県","令和元年9月～令和2年3月","日本キャタピラー 320（バックホウ）","Nikon Trimble Business Center HCE\nNikon Trimble EarthWorks",{"name":22,"img":23,"twitter":24},"川口 太助","img_staff-avatar-3","https://x.com/icon_kawaguchi",[26,30,34],{"img":27,"alt":28,"desc":29},"img_works-18-1","ICTのの建機日本キャタピラー320(バックホウ)の画像","ICTバックホウ（320）",{"img":31,"alt":32,"desc":33},"img_works-18-2","ICT建機日本キャタピラー320(バックホウ)の精度確認","ICTバックホウ精度確認",{"img":35,"alt":36,"desc":37},"img_works-18-3","ICT建機日本キャタピラー320(バックホウ)施工用データ設定","ICTバックホウ施工用データ設定","https://img.kensetsu-ict.com/work/img_works-18-1.jpg",[40,58,75,85],{"id":41,"title":42,"category":43,"status":44,"classificationList":45,"order":12,"summary":47,"images":48,"imageList":48,"person":54},"279","構造物工（橋台躯体工）におけるICT活用工事・BIM/CIM活用工事","施工","public",[46],"道路土工","ICT構造物（橋台）工",[49],["Reactive",50],{"id":51,"img":52,"alt":53},"1","img_works-279-1","BIM／CIM3次元モデル1",{"name":55,"img":56,"twitter":57},"宮川 栄幸","img_staff-avatar-1","",{"id":59,"title":60,"category":61,"status":44,"classificationList":62,"order":67,"summary":68,"images":69,"imageList":69,"person":74},"278","ICT活用工事（土工）導入講習 中級編（2026年）","セミナー・研修",[63,64,65,66],"DX・i-Con全般","3次元データ作成","3次元測量","BIM/CIM","民間企業","オンライン",[70],["Reactive",71],{"id":51,"img":72,"alt":73},"img_works-278-1","資料サムネイル",{"name":55,"img":56,"twitter":57},{"id":76,"title":77,"category":61,"status":44,"classificationList":78,"order":67,"summary":68,"images":79,"imageList":79,"person":83},"277","ICT活用工事（土工）導入講習 初級編（2026年）",[63],[80],["Reactive",81],{"id":51,"img":82,"alt":73},"img_works-277-1",{"name":22,"img":23,"twitter":84},"https://twitter.com/icon_kawaguchi",{"id":86,"title":87,"category":43,"status":44,"classificationList":88,"order":12,"summary":89,"images":90,"imageList":90,"person":95},"276","造成工事（除雪基地）におけるICT土工・ICT法面工",[46],"ICT土工",[91],["Reactive",92],{"id":51,"img":93,"alt":94},"img_works-276-1","TLS出来形測量（ICT法面工）",{"name":22,"img":23,"twitter":84},1777012171804]