[{"data":1,"prerenderedAt":97},["ShallowReactive",2],{"work-details-19":3},{"work":4,"imagePath":39,"latestWorkList":40},{"id":5,"createdAt":6,"type":7,"title":8,"description":9,"point":10,"contents":11,"person":22,"images":26},19,"2020/3/2","施工業務サポート","ドローン3次元出来形測量","非常に工期が短い現場でしたが、ICT施工を実施することでスムーズに工程が進み、予定通り出来形測量を迎えることができました。起工測量時と同様、計測箇所が非常に広範囲にわたるため、安全第一はもとより効率的に作業を進めることを意識しました。この測量結果をもって出来形帳票図作成作業に臨みます。","河川掘削工事の出来形測量をUAVによる空中写真測量で実施",{"order":12,"classification":13,"summary":14,"process":15,"scale":16,"area":17,"period":18,"machine":19,"system":20,"comment":21},"ICT施工者希望Ⅱ型","総合マネジメント","ICT掘削工","3次元出来形測量","約40,000㎡","島根県","令和元年9月～令和2年3月","DJI Matrice210RTK V2\nNikon Trimble SPS986","DJI Pilot","非常に工期が短い現場でしたが、ICT施工を実施することでスムーズに工程が進み、予定通り出来形測量を迎えることができました。現場を拝見すると3次元設計データ通りに施工が完了しており、出来形測量後の判定が無事に合格となることを願いながらの測量作業でした。起工測量時と同様、計測箇所が非常に広範囲にわたるため、安全第一はもとより効率的に作業を進めることを意識いたしました。この測量結果をもって出来形帳票図作成作業に臨みます。",{"name":23,"img":24,"twitter":25},"川口 太助","img_staff-avatar-3","https://x.com/icon_kawaguchi",[27,31,35],{"img":28,"alt":29,"desc":30},"img_works-19-1","対空標識を設置しているところ","対空標識設置",{"img":32,"alt":33,"desc":34},"img_works-19-2","ドローン空撮を行っているところ","ドローン空撮中",{"img":36,"alt":37,"desc":38},"img_works-19-3","GNSS測量をおこなっているところ","GNSS測量","https://img.kensetsu-ict.com/work/img_works-19-1.jpg",[41,59,76,86],{"id":42,"title":43,"category":44,"status":45,"classificationList":46,"order":12,"summary":48,"images":49,"imageList":49,"person":55},"279","構造物工（橋台躯体工）におけるICT活用工事・BIM/CIM活用工事","施工","public",[47],"道路土工","ICT構造物（橋台）工",[50],["Reactive",51],{"id":52,"img":53,"alt":54},"1","img_works-279-1","BIM／CIM3次元モデル1",{"name":56,"img":57,"twitter":58},"宮川 栄幸","img_staff-avatar-1","",{"id":60,"title":61,"category":62,"status":45,"classificationList":63,"order":68,"summary":69,"images":70,"imageList":70,"person":75},"278","ICT活用工事（土工）導入講習 中級編（2026年）","セミナー・研修",[64,65,66,67],"DX・i-Con全般","3次元データ作成","3次元測量","BIM/CIM","民間企業","オンライン",[71],["Reactive",72],{"id":52,"img":73,"alt":74},"img_works-278-1","資料サムネイル",{"name":56,"img":57,"twitter":58},{"id":77,"title":78,"category":62,"status":45,"classificationList":79,"order":68,"summary":69,"images":80,"imageList":80,"person":84},"277","ICT活用工事（土工）導入講習 初級編（2026年）",[64],[81],["Reactive",82],{"id":52,"img":83,"alt":74},"img_works-277-1",{"name":23,"img":24,"twitter":85},"https://twitter.com/icon_kawaguchi",{"id":87,"title":88,"category":44,"status":45,"classificationList":89,"order":12,"summary":90,"images":91,"imageList":91,"person":96},"276","造成工事（除雪基地）におけるICT土工・ICT法面工",[47],"ICT土工",[92],["Reactive",93],{"id":52,"img":94,"alt":95},"img_works-276-1","TLS出来形測量（ICT法面工）",{"name":23,"img":24,"twitter":85},1776677873147]