[{"data":1,"prerenderedAt":98},["ShallowReactive",2],{"work-details-3":3},{"work":4,"imagePath":39,"latestWorkList":40},{"id":5,"createdAt":6,"type":7,"title":8,"description":9,"point":10,"contents":11,"person":22,"images":26},3,"2019/7/23","施工業務サポート","ドローン3次元起工測量","既に現場では建機が稼働しており、UAV測量中は現場の方々にご協力をいただき、測量範囲には建機が無い状態で作業ができました。計測範囲には無線電波を遮る山があり受信状況が良くなかったため、GNSSの基地局を2か所に設置して対空標識の座標計測を行いました。","一部生活道路上空飛行が必要だったため、道路使用許可申請、UAV飛行区域・時間を考慮し安全飛行を実施",{"classification":12,"summary":13,"order":14,"process":15,"scale":16,"area":17,"period":18,"machine":19,"system":20,"comment":21},"河川土工","ICT路体盛土工","ICT施工者希望I型","3次元起工測量","路体盛土工 約28,000㎥","島根県","令和元年6月〜令和2年1月","DJI Phantom4Pro V2.0","DJI GSPro","既に現場では建機が稼働しており、UAV測量中は現場の方々にご協力をいただき、測量範囲には建機が無い状態で作業ができました。\n計測範囲には無線電波を遮る山があり受信状況が良くなかったため、GNSSの基地局を2か所に設置して対空標識の座標計測を行いました。",{"name":23,"img":24,"twitter":25},"川口 太助","img_staff-avatar-3","https://x.com/icon_kawaguchi",[27,31,35],{"img":28,"alt":29,"desc":30},"img_works-3-1","ICT施工起工測量_GNSS測量器による標定点・検証点の座標計測","GNSS測量器による標定点・検証点の座標計測",{"img":32,"alt":33,"desc":34},"img_works-3-2","ICT施工起工測量_UAV（ドローン）を用いた測量_飛行中の様子","UAV(ドローン)測量",{"img":36,"alt":37,"desc":38},"img_works-3-3","ICT施工起工測量_点群データのソフトウェア処理","点群データのソフトウェア処理","https://img.kensetsu-ict.com/work/img_works-3-1.jpg",[41,60,77,87],{"id":42,"title":43,"category":44,"status":45,"classificationList":46,"order":48,"summary":49,"images":50,"imageList":50,"person":56},"279","構造物工（橋台躯体工）におけるICT活用工事・BIM/CIM活用工事","施工","public",[47],"道路土工","ICT施工者希望Ⅱ型","ICT構造物（橋台）工",[51],["Reactive",52],{"id":53,"img":54,"alt":55},"1","img_works-279-1","BIM／CIM3次元モデル1",{"name":57,"img":58,"twitter":59},"宮川 栄幸","img_staff-avatar-1","",{"id":61,"title":62,"category":63,"status":45,"classificationList":64,"order":69,"summary":70,"images":71,"imageList":71,"person":76},"278","ICT活用工事（土工）導入講習 中級編（2026年）","セミナー・研修",[65,66,67,68],"DX・i-Con全般","3次元データ作成","3次元測量","BIM/CIM","民間企業","オンライン",[72],["Reactive",73],{"id":53,"img":74,"alt":75},"img_works-278-1","資料サムネイル",{"name":57,"img":58,"twitter":59},{"id":78,"title":79,"category":63,"status":45,"classificationList":80,"order":69,"summary":70,"images":81,"imageList":81,"person":85},"277","ICT活用工事（土工）導入講習 初級編（2026年）",[65],[82],["Reactive",83],{"id":53,"img":84,"alt":75},"img_works-277-1",{"name":23,"img":24,"twitter":86},"https://twitter.com/icon_kawaguchi",{"id":88,"title":89,"category":44,"status":45,"classificationList":90,"order":48,"summary":91,"images":92,"imageList":92,"person":97},"276","造成工事（除雪基地）におけるICT土工・ICT法面工",[47],"ICT土工",[93],["Reactive",94],{"id":53,"img":95,"alt":96},"img_works-276-1","TLS出来形測量（ICT法面工）",{"name":23,"img":24,"twitter":86},1775866476590]