[{"data":1,"prerenderedAt":114},["ShallowReactive",2],{"work-details-33":3},{"work":4,"imagePath":53,"latestWorkList":54},{"id":5,"createdAt":6,"type":7,"title":8,"description":9,"point":10,"contents":11,"person":21,"images":25},33,"2020/10/14","施工業務サポート","ドローン3次元起工測量","当初は前週にUAV起工測量を実施予定でしたが、日本列島に台風が接近していたため、現場監督と協議の上、安全を考慮して翌週に延期しました。広範囲での撮影のため、ドローンの飛行計画を3ルートに分けて撮影を実施しました。","約6万㎡の広域な施工範囲でUAVを活用し、効率的に三次元起工測量を実施。",{"order":12,"classification":13,"summary":14,"process":15,"scale":16,"area":17,"period":18,"machine":19,"system":20,"comment":9},"ICT発注者指定型","総合マネジメント","ICT掘削工","3次元起工測量","約60,000㎡","島根県","令和2年10月～令和3年3月","DJI Matrice210RTK V2\nNikon Trimble SPS986","DJI Pilot\nネットワーク型RTK-GNSS",{"name":22,"img":23,"twitter":24},"吉田 なぎさ","img_staff-avatar-2","https://x.com/iconsp_nyoshida",[26,29,32,35,38,41,44,47,50],{"img":27,"alt":28,"desc":28},"img_works-33-1","UAV空撮1",{"img":30,"alt":31,"desc":31},"img_works-33-2","UAV空撮2",{"img":33,"alt":34,"desc":34},"img_works-33-3","対空標識計測1",{"img":36,"alt":37,"desc":37},"img_works-33-4","対空標識計測2",{"img":39,"alt":40,"desc":40},"img_works-33-5","対空標識計測3",{"img":42,"alt":43,"desc":43},"img_works-33-6","対空標識計測4",{"img":45,"alt":46,"desc":46},"img_works-33-7","対空標識設置",{"img":48,"alt":49,"desc":49},"img_works-33-8","点群データ1",{"img":51,"alt":52,"desc":52},"img_works-33-9","点群データ2","https://img.kensetsu-ict.com/work/img_works-33-1.jpg",[55,74,91,103],{"id":56,"title":57,"category":58,"status":59,"classificationList":60,"order":62,"summary":63,"images":64,"imageList":64,"person":70},"279","構造物工（橋台躯体工）におけるICT活用工事・BIM/CIM活用工事","施工","public",[61],"道路土工","ICT施工者希望Ⅱ型","ICT構造物（橋台）工",[65],["Reactive",66],{"id":67,"img":68,"alt":69},"1","img_works-279-1","BIM／CIM3次元モデル1",{"name":71,"img":72,"twitter":73},"宮川 栄幸","img_staff-avatar-1","",{"id":75,"title":76,"category":77,"status":59,"classificationList":78,"order":83,"summary":84,"images":85,"imageList":85,"person":90},"278","ICT活用工事（土工）導入講習 中級編（2026年）","セミナー・研修",[79,80,81,82],"DX・i-Con全般","3次元データ作成","3次元測量","BIM/CIM","民間企業","オンライン",[86],["Reactive",87],{"id":67,"img":88,"alt":89},"img_works-278-1","資料サムネイル",{"name":71,"img":72,"twitter":73},{"id":92,"title":93,"category":77,"status":59,"classificationList":94,"order":83,"summary":84,"images":95,"imageList":95,"person":99},"277","ICT活用工事（土工）導入講習 初級編（2026年）",[79],[96],["Reactive",97],{"id":67,"img":98,"alt":89},"img_works-277-1",{"name":100,"img":101,"twitter":102},"川口 太助","img_staff-avatar-3","https://twitter.com/icon_kawaguchi",{"id":104,"title":105,"category":58,"status":59,"classificationList":106,"order":62,"summary":107,"images":108,"imageList":108,"person":113},"276","造成工事（除雪基地）におけるICT土工・ICT法面工",[61],"ICT土工",[109],["Reactive",110],{"id":67,"img":111,"alt":112},"img_works-276-1","TLS出来形測量（ICT法面工）",{"name":100,"img":101,"twitter":102},1776764165065]