[{"data":1,"prerenderedAt":106},["ShallowReactive",2],{"work-details-55":3},{"work":4,"imagePath":47,"latestWorkList":48},{"id":5,"createdAt":6,"type":7,"title":8,"description":9,"point":10,"contents":11,"person":21,"images":25},55,"2021/2/12","施工業務サポート","TLS3次元出来形測量","現場ではモルタル吹付の片付けと次工程のアンカー工に向けた施工段取りが進行していました。現場の作業が滞りなく進行できるよう、現場監督や下請施工業者と連携しながら、タイミングを見計らい地上型レーザースキャナー測量を実施しました。また、点群を取得できなかった箇所はTSで補測を行いました。","現場の施工が進行する中、円滑な出来形測量を実施。",{"order":12,"classification":13,"summary":14,"process":15,"scale":16,"area":17,"period":18,"machine":19,"system":20,"comment":9},"ICT施工者希望B型","河川土工","ICT法面工","地上型レーザースキャナー出来形測量","約1,100㎡","島根県","令和3年1月～令和3年7月","Nicon Trimble SX10","Nikon Trimble RealWorks\n福井コンピュータ TREND-POINT\nAUTODESK ReCap",{"name":22,"img":23,"twitter":24},"川口 太助","img_staff-avatar-3","https://x.com/icon_kawaguchi",[26,29,32,35,38,41,44],{"img":27,"alt":28,"desc":28},"img_works-55-1","ICT法面工現場",{"img":30,"alt":31,"desc":31},"img_works-55-2","地上型レーザースキャナー計測1",{"img":33,"alt":34,"desc":34},"img_works-55-3","地上型レーザースキャナー計測2",{"img":36,"alt":37,"desc":37},"img_works-55-4","地上型レーザースキャナー計測3",{"img":39,"alt":40,"desc":40},"img_works-55-5","TS補測",{"img":42,"alt":43,"desc":43},"img_works-55-6","点群オリジナルデータ",{"img":45,"alt":46,"desc":46},"img_works-55-7","点群編集データ","https://img.kensetsu-ict.com/work/img_works-55-1.jpg",[49,68,85,95],{"id":50,"title":51,"category":52,"status":53,"classificationList":54,"order":56,"summary":57,"images":58,"imageList":58,"person":64},"279","構造物工（橋台躯体工）におけるICT活用工事・BIM/CIM活用工事","施工","public",[55],"道路土工","ICT施工者希望Ⅱ型","ICT構造物（橋台）工",[59],["Reactive",60],{"id":61,"img":62,"alt":63},"1","img_works-279-1","BIM／CIM3次元モデル1",{"name":65,"img":66,"twitter":67},"宮川 栄幸","img_staff-avatar-1","",{"id":69,"title":70,"category":71,"status":53,"classificationList":72,"order":77,"summary":78,"images":79,"imageList":79,"person":84},"278","ICT活用工事（土工）導入講習 中級編（2026年）","セミナー・研修",[73,74,75,76],"DX・i-Con全般","3次元データ作成","3次元測量","BIM/CIM","民間企業","オンライン",[80],["Reactive",81],{"id":61,"img":82,"alt":83},"img_works-278-1","資料サムネイル",{"name":65,"img":66,"twitter":67},{"id":86,"title":87,"category":71,"status":53,"classificationList":88,"order":77,"summary":78,"images":89,"imageList":89,"person":93},"277","ICT活用工事（土工）導入講習 初級編（2026年）",[73],[90],["Reactive",91],{"id":61,"img":92,"alt":83},"img_works-277-1",{"name":22,"img":23,"twitter":94},"https://twitter.com/icon_kawaguchi",{"id":96,"title":97,"category":52,"status":53,"classificationList":98,"order":56,"summary":99,"images":100,"imageList":100,"person":105},"276","造成工事（除雪基地）におけるICT土工・ICT法面工",[55],"ICT土工",[101],["Reactive",102],{"id":61,"img":103,"alt":104},"img_works-276-1","TLS出来形測量（ICT法面工）",{"name":22,"img":23,"twitter":94},1777012176597]