[{"data":1,"prerenderedAt":100},["ShallowReactive",2],{"work-details-56":3},{"work":4,"imagePath":41,"latestWorkList":42},{"id":5,"createdAt":6,"type":7,"title":8,"description":9,"point":10,"contents":11,"person":21,"images":25},56,"2021/2/17","施工業務サポート","3次元出来形管理データ作成","ICT法面工（モルタル吹付）の出来形管理にあたり、「三次元計測技術を用いた出来形計測要領（案）」に準じてデータを作成しました。今回は「法長」と「延長」の項目で三次元計測を行い、数量算出を従来の展開図ではなく、三次元座標を用いた面積計算で行いました。より細かい面積計算が可能になり、想定数量よりも出来高が増えています。","三次元計測技術を用いた出来形管理を実施。",{"order":12,"classification":13,"summary":14,"process":8,"scale":15,"area":16,"period":17,"machine":18,"system":19,"comment":20},"ICT施工者希望B型","河川土工","ICT法面工","約1,100㎡","島根県","令和3年1月～令和3年7月"," - ","福井コンピュータ EX-TREND武蔵\n福井コンピュータ TREND-POINT","ICT法面工（モルタル吹付）の出来形管理にあたり「三次元計測技術を用いた出来形計測要領（案）」に準じて、出来形管理データを作成しました。\n今回の現場では出来形管理項目として「法長」と「延長」の三次元計測を行い、数量算出を従来の展開図ではなく、三次元座標を用いた面積計算で行いました。従来の展開図と比べて細かい面積計算が可能になり、想定数量よりも出来高が増える結果となりました。",{"name":22,"img":23,"twitter":24},"川口 太助","img_staff-avatar-3","https://x.com/icon_kawaguchi",[26,29,32,35,38],{"img":27,"alt":28,"desc":28},"img_works-56-1","出来形管理データ1",{"img":30,"alt":31,"desc":31},"img_works-56-2","出来形管理データ2",{"img":33,"alt":34,"desc":34},"img_works-56-3","出来形計測（法長）",{"img":36,"alt":37,"desc":37},"img_works-56-4","出来形計測（延長）",{"img":39,"alt":40,"desc":40},"img_works-56-5","三次元座標を用いた数量算出","https://img.kensetsu-ict.com/work/img_works-56-1.jpg",[43,62,79,89],{"id":44,"title":45,"category":46,"status":47,"classificationList":48,"order":50,"summary":51,"images":52,"imageList":52,"person":58},"279","構造物工（橋台躯体工）におけるICT活用工事・BIM/CIM活用工事","施工","public",[49],"道路土工","ICT施工者希望Ⅱ型","ICT構造物（橋台）工",[53],["Reactive",54],{"id":55,"img":56,"alt":57},"1","img_works-279-1","BIM／CIM3次元モデル1",{"name":59,"img":60,"twitter":61},"宮川 栄幸","img_staff-avatar-1","",{"id":63,"title":64,"category":65,"status":47,"classificationList":66,"order":71,"summary":72,"images":73,"imageList":73,"person":78},"278","ICT活用工事（土工）導入講習 中級編（2026年）","セミナー・研修",[67,68,69,70],"DX・i-Con全般","3次元データ作成","3次元測量","BIM/CIM","民間企業","オンライン",[74],["Reactive",75],{"id":55,"img":76,"alt":77},"img_works-278-1","資料サムネイル",{"name":59,"img":60,"twitter":61},{"id":80,"title":81,"category":65,"status":47,"classificationList":82,"order":71,"summary":72,"images":83,"imageList":83,"person":87},"277","ICT活用工事（土工）導入講習 初級編（2026年）",[67],[84],["Reactive",85],{"id":55,"img":86,"alt":77},"img_works-277-1",{"name":22,"img":23,"twitter":88},"https://twitter.com/icon_kawaguchi",{"id":90,"title":91,"category":46,"status":47,"classificationList":92,"order":50,"summary":93,"images":94,"imageList":94,"person":99},"276","造成工事（除雪基地）におけるICT土工・ICT法面工",[49],"ICT土工",[95],["Reactive",96],{"id":55,"img":97,"alt":98},"img_works-276-1","TLS出来形測量（ICT法面工）",{"name":22,"img":23,"twitter":88},1776764167908]