[{"data":1,"prerenderedAt":98},["ShallowReactive",2],{"work-details-58":3},{"work":4,"imagePath":40,"latestWorkList":41},{"id":5,"createdAt":6,"type":7,"title":8,"description":9,"point":10,"contents":11,"person":20,"images":24},58,"2021/2/26","施工業務サポート","ローカライゼーション","ICT施工対象範囲外の橋台の床掘を行う作業土工で、施工性を上げるためにICT建機を活用されることになり、ローカライゼーションとICT建機データ設定の依頼をいただきました。事前に行った元請け現場監督様と下請け施工会社の職長様との打合せでは、工事基準点の追加を検討し、当日は準備万端の状態で作業に取り掛かることができました。","ICT建機を用いた橋台の床掘作業を行うため、ローカライゼーションを実施。",{"order":12,"classification":13,"summary":14,"process":8,"scale":15,"area":16,"period":17,"machine":18,"system":19,"comment":9},"ICT施工者希望I型","河川土工","工事用道路の設置","路体盛土工 15,000㎥\n法面整形 4,000㎡","島根県","令和元年9月～令和3年3月","Nikon Trimble SPS986","ネットワーク型RTK-GNSS",{"name":21,"img":22,"twitter":23},"宮川 栄幸","img_staff-avatar-1","",[25,28,31,34,37],{"img":26,"alt":27,"desc":27},"img_works-58-1","ローカライゼーション計測１",{"img":29,"alt":30,"desc":30},"img_works-58-2","ローカライゼーション計測２",{"img":32,"alt":33,"desc":33},"img_works-58-3","ローカライゼーション計測３",{"img":35,"alt":36,"desc":36},"img_works-58-4","ローカライゼーション計測４",{"img":38,"alt":39,"desc":39},"img_works-58-5","ローカライゼーション計測５","https://img.kensetsu-ict.com/work/img_works-58-1.jpg",[42,58,75,87],{"id":43,"title":44,"category":45,"status":46,"classificationList":47,"order":49,"summary":50,"images":51,"imageList":51,"person":57},"279","構造物工（橋台躯体工）におけるICT活用工事・BIM/CIM活用工事","施工","public",[48],"道路土工","ICT施工者希望Ⅱ型","ICT構造物（橋台）工",[52],["Reactive",53],{"id":54,"img":55,"alt":56},"1","img_works-279-1","BIM／CIM3次元モデル1",{"name":21,"img":22,"twitter":23},{"id":59,"title":60,"category":61,"status":46,"classificationList":62,"order":67,"summary":68,"images":69,"imageList":69,"person":74},"278","ICT活用工事（土工）導入講習 中級編（2026年）","セミナー・研修",[63,64,65,66],"DX・i-Con全般","3次元データ作成","3次元測量","BIM/CIM","民間企業","オンライン",[70],["Reactive",71],{"id":54,"img":72,"alt":73},"img_works-278-1","資料サムネイル",{"name":21,"img":22,"twitter":23},{"id":76,"title":77,"category":61,"status":46,"classificationList":78,"order":67,"summary":68,"images":79,"imageList":79,"person":83},"277","ICT活用工事（土工）導入講習 初級編（2026年）",[63],[80],["Reactive",81],{"id":54,"img":82,"alt":73},"img_works-277-1",{"name":84,"img":85,"twitter":86},"川口 太助","img_staff-avatar-3","https://twitter.com/icon_kawaguchi",{"id":88,"title":89,"category":45,"status":46,"classificationList":90,"order":49,"summary":91,"images":92,"imageList":92,"person":97},"276","造成工事（除雪基地）におけるICT土工・ICT法面工",[48],"ICT土工",[93],["Reactive",94],{"id":54,"img":95,"alt":96},"img_works-276-1","TLS出来形測量（ICT法面工）",{"name":84,"img":85,"twitter":86},1775866480533]