[{"data":1,"prerenderedAt":97},["ShallowReactive",2],{"work-details-66":3},{"work":4,"imagePath":38,"latestWorkList":39},{"id":5,"createdAt":6,"type":7,"title":8,"description":9,"point":10,"contents":11,"person":21,"images":25},66,"2021/4/8","施工業務サポート","3次元モデル作成・数量算出","ICT法面工（モルタル吹付）、アンカー工に加えて、特殊工法である「PCWパネル設置工」もICTで出来形管理を実施することになりました。現場監督から日々発生している河川の排水ポンプ燃料費の削減希望があり、ICT出来形計測を複数に分けて実施することで、河川の早期回復を目指しています。","軽量盛土工のICT出来形管理を実施。出来形管理要領にはまだ定めがない独自の取組み。",{"order":12,"classification":13,"summary":14,"process":8,"scale":15,"area":16,"period":17,"machine":18,"system":19,"comment":20},"ICT施工者希望B型","河川土工","軽量盛土工","約1,100㎡","島根県","令和3年1月～令和3年7月","Nicon Trimble SX10","福井コンピュータ EX-TREND武蔵\n福井コンピュータ TREND-POINT","現場監督のご要望によりICT法面工（モルタル吹付）やその他工種に加え軽量盛土工でもICT出来形の自主管理を行うことになりました。\n従来管理ではPCWパネル設置にあわせて日々現地での断面計測が必要です。地上型レーザースキャナーで計測した点群データを合わせて、3次元モデルを作成し、ICTで数量を算出しました。その結果、現場のICT出来形管理の工種（モルタル吹付、アンカー工、軽量盛土工、PCWパネル設置工）の中で最も省力化につながったと現場監督から評価いただいています。",{"name":22,"img":23,"twitter":24},"川口 太助","img_staff-avatar-3","https://x.com/icon_kawaguchi",[26,29,32,35],{"img":27,"alt":28,"desc":28},"img_works-66-1","3次元モデル作成1",{"img":30,"alt":31,"desc":31},"img_works-66-2","3次元モデル作成2",{"img":33,"alt":34,"desc":34},"img_works-66-3","3次元モデル作成3",{"img":36,"alt":37,"desc":37},"img_works-66-4","ICT数量算出（軽量盛土工）","https://img.kensetsu-ict.com/work/img_works-66-1.jpg",[40,59,76,86],{"id":41,"title":42,"category":43,"status":44,"classificationList":45,"order":47,"summary":48,"images":49,"imageList":49,"person":55},"279","構造物工（橋台躯体工）におけるICT活用工事・BIM/CIM活用工事","施工","public",[46],"道路土工","ICT施工者希望Ⅱ型","ICT構造物（橋台）工",[50],["Reactive",51],{"id":52,"img":53,"alt":54},"1","img_works-279-1","BIM／CIM3次元モデル1",{"name":56,"img":57,"twitter":58},"宮川 栄幸","img_staff-avatar-1","",{"id":60,"title":61,"category":62,"status":44,"classificationList":63,"order":68,"summary":69,"images":70,"imageList":70,"person":75},"278","ICT活用工事（土工）導入講習 中級編（2026年）","セミナー・研修",[64,65,66,67],"DX・i-Con全般","3次元データ作成","3次元測量","BIM/CIM","民間企業","オンライン",[71],["Reactive",72],{"id":52,"img":73,"alt":74},"img_works-278-1","資料サムネイル",{"name":56,"img":57,"twitter":58},{"id":77,"title":78,"category":62,"status":44,"classificationList":79,"order":68,"summary":69,"images":80,"imageList":80,"person":84},"277","ICT活用工事（土工）導入講習 初級編（2026年）",[64],[81],["Reactive",82],{"id":52,"img":83,"alt":74},"img_works-277-1",{"name":22,"img":23,"twitter":85},"https://twitter.com/icon_kawaguchi",{"id":87,"title":88,"category":43,"status":44,"classificationList":89,"order":47,"summary":90,"images":91,"imageList":91,"person":96},"276","造成工事（除雪基地）におけるICT土工・ICT法面工",[46],"ICT土工",[92],["Reactive",93],{"id":52,"img":94,"alt":95},"img_works-276-1","TLS出来形測量（ICT法面工）",{"name":22,"img":23,"twitter":85},1777012177988]