[{"data":1,"prerenderedAt":98},["ShallowReactive",2],{"work-details-68":3},{"work":4,"imagePath":39,"latestWorkList":40},{"id":5,"createdAt":6,"type":7,"title":8,"description":9,"point":10,"contents":11,"person":22,"images":26},68,"2021/4/15","施工業務サポート","TLS3次元出来形測量（2回目）","特殊工法の「PCWパネル設置工」では、一日に高さ1mずつのペースで施工が進みます。河川復旧が可能な高さを超えたタイミングで2回目の出来形測量を行いました。複数回に分けて3次元計測を行う場合、点群データを統合することで施工範囲全体の出来形管理が可能です。","ICT出来形計測を複数回にわけることで、河川の早期復旧を実現。",{"order":12,"classification":13,"summary":14,"process":15,"scale":16,"area":17,"period":18,"machine":19,"system":20,"comment":21},"ICT施工者希望B型","河川土工","PCWパネル設置工","地上型レーザースキャナー出来形測量","約1,100㎡","島根県","令和3年1月～令和3年7月","Nicon Trimble SX10","Nikon Trimble RealWorks\n福井コンピュータ TREND-POINT","特殊工法の「PCWパネル設置工」では、一日に高さ1mずつのペースで施工が進みます。河川復旧が可能な高さを超えたタイミングで、2回目の出来形測量を行いました。\n複数回に分けて3次元計測を行う場合、点群データを統合することで施工範囲全体の出来形管理が可能です。ICT技術の活用によって河川の早期復旧が可能になり、現場の予算管理でも効果が得られています。",{"name":23,"img":24,"twitter":25},"川口 太助","img_staff-avatar-3","https://x.com/icon_kawaguchi",[27,30,33,36],{"img":28,"alt":29,"desc":29},"img_works-68-1","地上型レーザースキャナー計測 (1)",{"img":31,"alt":32,"desc":32},"img_works-68-2","地上型レーザースキャナー計測 (2)",{"img":34,"alt":35,"desc":35},"img_works-68-3","点群オリジナルデータ",{"img":37,"alt":38,"desc":38},"img_works-68-4","点群編集データ","https://img.kensetsu-ict.com/work/img_works-68-1.jpg",[41,60,77,87],{"id":42,"title":43,"category":44,"status":45,"classificationList":46,"order":48,"summary":49,"images":50,"imageList":50,"person":56},"279","構造物工（橋台躯体工）におけるICT活用工事・BIM/CIM活用工事","施工","public",[47],"道路土工","ICT施工者希望Ⅱ型","ICT構造物（橋台）工",[51],["Reactive",52],{"id":53,"img":54,"alt":55},"1","img_works-279-1","BIM／CIM3次元モデル1",{"name":57,"img":58,"twitter":59},"宮川 栄幸","img_staff-avatar-1","",{"id":61,"title":62,"category":63,"status":45,"classificationList":64,"order":69,"summary":70,"images":71,"imageList":71,"person":76},"278","ICT活用工事（土工）導入講習 中級編（2026年）","セミナー・研修",[65,66,67,68],"DX・i-Con全般","3次元データ作成","3次元測量","BIM/CIM","民間企業","オンライン",[72],["Reactive",73],{"id":53,"img":74,"alt":75},"img_works-278-1","資料サムネイル",{"name":57,"img":58,"twitter":59},{"id":78,"title":79,"category":63,"status":45,"classificationList":80,"order":69,"summary":70,"images":81,"imageList":81,"person":85},"277","ICT活用工事（土工）導入講習 初級編（2026年）",[65],[82],["Reactive",83],{"id":53,"img":84,"alt":75},"img_works-277-1",{"name":23,"img":24,"twitter":86},"https://twitter.com/icon_kawaguchi",{"id":88,"title":89,"category":44,"status":45,"classificationList":90,"order":48,"summary":91,"images":92,"imageList":92,"person":97},"276","造成工事（除雪基地）におけるICT土工・ICT法面工",[47],"ICT土工",[93],["Reactive",94],{"id":53,"img":95,"alt":96},"img_works-276-1","TLS出来形測量（ICT法面工）",{"name":23,"img":24,"twitter":86},1776677880177]