[{"data":1,"prerenderedAt":102},["ShallowReactive",2],{"work-details-94":3},{"work":4,"imagePath":45,"latestWorkList":46},{"id":5,"createdAt":6,"type":7,"title":8,"description":9,"point":10,"contents":11,"person":22,"images":26},94,"2021/7/13","施工業務サポート","ドローン3次元起工測量","ICT施工範囲付近に高圧電線が立っているため、現場監督様と協議の上、安全性を考慮して高圧電線付近は後日改めて地上型レーザースキャナー測量を実施することになる。それ以外の対象範囲はUAV空中写真測量にて計測。計測範囲の高度差が大きかったため、ドローンの飛行ルートごとに飛行高度を変えて計測を実施。","近くに高圧電線があるため、UAV測量と地上型レーザースキャナー測量を併用",{"order":12,"classification":13,"summary":14,"process":15,"scale":16,"area":17,"period":18,"machine":19,"system":20,"comment":21},"ICT施工者希望Ⅱ型","河川土工","ICT盛土工","3次元起工測量","盛土工　約6,600㎥\n掘削工　約600㎥","島根県","令和3年4月～令和3年11月","DJI Matrice210RTK V2\nNicon Trimble SX10","DJI Pilot","ICT施工範囲付近に高圧電線が立っているため、現場監督様と協議の上、安全性を考慮して高圧電線付近は後日改めて地上型レーザースキャナー測量を実施することになりました。それ以外の対象範囲をUAV空中写真測量にて計測しました。計測範囲の高度差が大きかったため、ドローンの飛行ルートごとに飛行高度を変えて計測を実施しました。",{"name":23,"img":24,"twitter":25},"宮川 栄幸","img_staff-avatar-1","",[27,30,33,36,39,42],{"img":28,"alt":29,"desc":29},"img_works-94-1","UAV空撮1",{"img":31,"alt":32,"desc":32},"img_works-94-2","UAV空撮2",{"img":34,"alt":35,"desc":35},"img_works-94-3","対空標識計測",{"img":37,"alt":38,"desc":38},"img_works-94-4","対空標識設置",{"img":40,"alt":41,"desc":41},"img_works-94-5","点群オリジナルデータ",{"img":43,"alt":44,"desc":44},"img_works-94-6","点群編集データ","https://img.kensetsu-ict.com/work/img_works-94-1.jpg",[47,62,79,91],{"id":48,"title":49,"category":50,"status":51,"classificationList":52,"order":12,"summary":54,"images":55,"imageList":55,"person":61},"279","構造物工（橋台躯体工）におけるICT活用工事・BIM/CIM活用工事","施工","public",[53],"道路土工","ICT構造物（橋台）工",[56],["Reactive",57],{"id":58,"img":59,"alt":60},"1","img_works-279-1","BIM／CIM3次元モデル1",{"name":23,"img":24,"twitter":25},{"id":63,"title":64,"category":65,"status":51,"classificationList":66,"order":71,"summary":72,"images":73,"imageList":73,"person":78},"278","ICT活用工事（土工）導入講習 中級編（2026年）","セミナー・研修",[67,68,69,70],"DX・i-Con全般","3次元データ作成","3次元測量","BIM/CIM","民間企業","オンライン",[74],["Reactive",75],{"id":58,"img":76,"alt":77},"img_works-278-1","資料サムネイル",{"name":23,"img":24,"twitter":25},{"id":80,"title":81,"category":65,"status":51,"classificationList":82,"order":71,"summary":72,"images":83,"imageList":83,"person":87},"277","ICT活用工事（土工）導入講習 初級編（2026年）",[67],[84],["Reactive",85],{"id":58,"img":86,"alt":77},"img_works-277-1",{"name":88,"img":89,"twitter":90},"川口 太助","img_staff-avatar-3","https://twitter.com/icon_kawaguchi",{"id":92,"title":93,"category":50,"status":51,"classificationList":94,"order":12,"summary":95,"images":96,"imageList":96,"person":101},"276","造成工事（除雪基地）におけるICT土工・ICT法面工",[53],"ICT土工",[97],["Reactive",98],{"id":58,"img":99,"alt":100},"img_works-276-1","TLS出来形測量（ICT法面工）",{"name":88,"img":89,"twitter":90},1776764172523]